top of page

Property Services

01

Architectural and permit support for rebuilding fire-damaged multifamily units in Daly City, addressing inspection comments and permit revisions while managing cost.

02

Code-compliance improvements to the pool enclosure at a Santa Clara multifamily property, translating County inspection findings into a coordinated repair plan.

03

Renovation and expansion of a 608-square-foot leasing lobby in Daly City, coordinating exterior enclosure, signage, accessibility, structural and fire-related improvements.

04

Selective replacement of a dry-rot-damaged beam supporting an occupied second-level walkway in San Mateo, with coordinated waterproofing restoration and limited demolition.

05

Targeted improvements to the leasing area and business center at a San Jose apartment community, including a slat wall, relocated floor power, glazing and privacy film.

06

Division of a ground-floor retail shell into two warm-shell lease spaces in Sunnyvale, with infrastructure for future retail, service and food-service tenants.

07

Like-for-like reconstruction of three fire-damaged apartment units in Daly City, keeping the permit scope focused on recovery and unaffected areas intact.

08

Selective repair of two dry-rot-damaged walkway beams in East Palo Alto, coordinating structural replacement and waterproofing while the building remained occupied.

09

Targeted porch, walkway and waterproofing repairs at a San Jose apartment property, addressing both visible damage and the water conditions that caused it.

10

Fence and gate corrections following a County pool-enclosure inspection at a Santa Clara multifamily property, restoring compliance without a larger renovation.

11

A focused rooftop access improvement at a Walnut Creek mixed-use property, adding a new door and structural opening without affecting unrelated building systems.

12

Post-fire assessment and restoration planning for an 800-square-foot apartment unit in Daly City, limiting structural replacement to the damage confirmed after demolition.

13

Replacement of a nine-stall carport with a trash-compactor enclosure and conversion of underused maintenance structures, improving service operations while gaining 37 covered stalls.

14

Targeted improvements to a 5,717-square-foot hillside residence in Emerald Hills, including a patio opening, entry columns, deck, waterproofing, guardrail and structural work.

15

Restoration of two fire- and smoke-damaged apartment units in Daly City, coordinating interior reconstruction, building systems, structural reinforcement and permit requirements.

bottom of page